4.11

Checking the installation

4 remove the attached adhesive labels from the unit and
from the connection pipes.
4 ensure that all connections between the stove system and
chimney are leak-tight.
4 ensure that the necessary protective devices are functional.
6 "2.4 protective devices" (page 6).
4 ensure that the necessary safety distances are observed.
6 "4.3.2 safety distances" (page 21).
4 ensure that sufficient fresh air is supplied to the installation
room.

4.12 Performing initial start-up

the initial start-up must be performed by qualified personnel.
, "1.2.3 Qualified personnel" (page 4).
before the unit is used for the first time, the requirements for
safe and intended use must be met:
the stove systems complies with the valid regulations and
has been approved by the approval authority or supervisory
authority (in germany e.g. district chimney sweep).
the unit is fully installed and connected. its proper
installation has been checked.
6 "4.11 Checking the installation" (page 35).
the unit is dirt-free, all cleaning agent has been removed.
6 "6. Cleaning" (page 43).
preparation:
4 ensure sufficient fresh air supply.
4 if installed, open the locking devices in the combustion air
pipe or in the flue gas connection.
4 ensure that the ash pan has been emptied.
4 ensure that no flammable materials or objects are located
on the unit or near the unit.
the first heating process dries out the applied protective paint
and burns the corrosion protection coating into the surface of
the unit. this may generate an odour as well as some smoke
and cause water to emerge from the firebox lining.
How to proceed:
4 only use a small volume of wood during the first heating
process.
4 Heat up the unit.
6 "5.2.2 Heating up the unit" (page 39).
4 increase the quantity of wood to the nominal heat output in
3 – 5 burning processes.
6 "2.8 technical data" (page 10).
if no more smoke generation can be detected on the unit:
4 perform another combustion process.
the burn-in process up to the temperature reached in the final
combustion process is complete.
As long as the first heating process is ongoing:
4 ensure that nobody touches the unit.
4 ensure that no objects are placed on the unit.
4 thoroughly ventilate the installation room and all
connected rooms.
4 ensure that no persons remain in these rooms for a longer
period.
if problems related to the delivery pressure and flue gas
extraction occur on the chimney:
4 measure the delivery pressure of the chimney.

4.13 Instructing the owner

prior to initial use, the qualified personnel performing
installation must instruct the owner in the following matters:
instruction on the intended use of the unit.
instruction on safe, proper, environment-friendly heating.
explanation of permissible types of fuel and the
consequences of using unintended types of fuel.
explanation of the effects and operation of the unit,
particularly taking into account safety-relevant actions.
explanation of the necessity of cleaning and servicing for
safe, environmentally friendly operation.
note that the stove system may not be modified.
information about the owner's responsibility and tasks.
6 "1.2.2 owner" (page 4).
once the first heating process has been completed
successfully:
3 the first start-up and transfer have been logged.
3 this manual and all technical documents have been
handed over to the owner.
Assembly and operating manual | Premium & Lean | 06.2023 | en
35

Advertisement

Table of Contents
loading

Table of Contents