Assembly
With flammable construction materials
4.10 / 3
A
B
C
D
E
F
G
H
I
32
Assembly and operating manual | Premium & Lean | 06.2023 | en
A insulation of the convection chamber
B Hot air line
2
C insulated flue gas pipe (connection piece)
D pipe routing through walls and ceilings (with building
authority usability certificate)
E Convection air housing made of sheet steel (optional)
J
F rear ventilation (50 mm)
G brickwork
4
H Floor protection layer
I
Flammable construction material (wooden floor)
J Hot air outlet
K Air supply grating (hot air outlet)
L Convection chamber
K
M insulation of the convection air housing
N Fireplace lining made from non-flammable construction
material
L
O support frame with insulation strips
M
P Circulating air grating (cold air supply)
N
Q Combustion air line (optional)
For information on the insulating material thickness, refer to
1
the separate document "technical data".
insulation required if temperatures above 85 °C are possible
2
O
(depending on the specific installation situation).
if a convection air housing is used, all connections must be
3
connected to hot air lines.
100 mm thick, if necessary replacement insulating material
4
(e.g. calcium silicate).
Within the convection chamber made of non-flammable
5
material, provided no insulation is required.
P
500 mm distance between top edge and ceiling.
6
Q
insulation with shape-retaining mineral wool,
7
min. 30 mm thick.