4.3

Requirements for the installation site

4.3.1

Installation room

the installation room must be suitable for safe use.
the installation room must be dry and protected against
freezing.
the unit must be protected against freezing and weather
factors.
the installation surface must have a suitable load-bearing
capacity, keeping the weight of the unit in mind.
6 "2.8 technical data" (page 10).
the installation surface must be level and horizontal.
if the floor in front of the firebox door is flammable, it must
be protected by a spark guard plate.
A sufficient fresh air supply must be ensured by means of
a ventilation opening to the outdoors (cross section at least
150 cm
) or by a combustion air network with other rooms.
2
if air extracting units are used at the same time (e.g.
extraction hoods, hot-air system, ventilating or exhaust
air systems), a safety device must be installed or a unit
certified for room air sealed use and connected accordingly
must be installed. the safety devices must monitor the
permissible underpressure in the installation room (deviation
max. 8 pa from outdoors) and prevent gases from entering
the room. A general technical approval must have been
given by the responsible authorities.
4.3.2

Safety distances

. WARNING!
Risk of fire resulting from non-adherence to safety
distances!
using the unit creates very high temperatures. smoke and
sparks may escape when opening the firebox door. sensitive
items near the unit may become damaged or deformed,
may melt or catch fire.
4 ensure that flammable objects and materials (e.g. wooden
beams) are taken into account for assembly. ensure a
sufficient distance or use protective devices.
4.3.2 / 1
A Flammable construction material
Assembly and operating manual | Premium & Lean | 06.2023 | en