4.10 Installing the unit on site
the brickwork for the convection chamber and the lining of
the unit is installed on site. to ensure problem-free operation,
absolutely adhere to the requirements listed in this chapter.
the following images of installation situations are used as
examples for all units.
With non-flammable construction materials
4.10 / 1
A
B
C
A insulation of the convection chamber
B Wall collar
C Flue gas pipe (connection piece)
D Air supply grating (hot air outlet)
E Convection chamber
F Fireplace lining made from non-flammable construction
material
G support frame with insulation strips
H Circulating air grating (cold air supply)
I
Combustion air line (optional)
For information on the insulating material thickness, refer to
1
the separate document "technical data".
500 mm distance between top edge and ceiling.
2
D
E
F
G
H
I
1
2
Assembly and operating manual | Premium & Lean | 06.2023 | en
4.10 / 2
A
B
C
D
A insulation of the convection chamber
B Wall collar
C insulated flue gas pipe (connection piece)
D Convection air housing (optional)
E Hot air outlet
F Convection chamber
G Air supply grating
3
H Hot air line
4
I
insulation of the convection air housing
J Fireplace lining made from non-flammable construction
material
K support frame with insulation strips
L Circulating air grating (cold air supply)
M Combustion air line (optional)
1
For information on the insulating material thickness, refer to
the separate document "technical data".
if a convection air housing is used, all connections must be
2
connected to hot air lines.
500 mm distance between top edge and ceiling.
3
insulation required if temperatures above 85 °C are possible
4
(depending on the specific installation situation).
insulation with shape-retaining mineral wool,
5
min. 30 mm thick.
E
F
G
H
I
J
K
L
M
1
2
5
31