Installation Of The Sewing Machine Head; Installing The Drain Receiver And The Head Support Rubber - JUKI LK-1901AN Instruction Manual

Table of Contents

Advertisement

5 . Installation of the sewing machine head
WARNING :
To prevent possible accidents caused by the full of the sewing machine, perform the work by two
persons or more when the machine is moved.
A
3
6 . Installing the drain receiver and the head support rubber
6
1
4
A
1
1
2
3
4
2
4
3
2
5
6
) Fit hinge rubber 1 to the hinge shaft ,and fix the
sewing machine main unit.
2) When tightening nut 3 to hinge rubber 1 , tighten
nut 3 until spring washer 2 becomes as B in the
illustration, and fix it with nut 4 .
If tightening hinge rubber 1 excessively,
it will not work properly. So, be careful.
Hold section A when moving the sew-
ing machine.
2
3
4
) Fix drain receiver 2 in the installing hole of table
1 with four setscrews 3 .
2) Screw in drain bin 4 to drain receiver 2 .
3) Insert sewing machine drain pipe 5 into drain bin
4 .
4) Insert head support rubber 6 into table 1 .
1. Insert drain pipe 5 until it will go no
further so that it does not come off
drain bin 4 when tilting the machine
head.
2. Remove the tape fixing drain pipe 5 .
6
2
A
2
B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lk-1902anLk-1903anLk-1903an-305

Table of Contents