Installation; Positioning And Levelling - Hussmann PMM20F3R Installation Manual

Medium temperature remote cabinet
Table of Contents

Advertisement

INSTALLATION

3.1

POSITIONING AND LEVELLING

Unwrap the cabinet and remove the shipping braces
and metal covers. Lift up cabinet and remove shipping
base.
FIGURE 3A - Remove Shipping Base
To position the cases:
1. If the plinth surface is not level, determine
where the highest point of the plinth is, and
position the case allocated to this position first.
2. Snap a chalk line on the floor to use as a guide for
positioning the front of the cases in the line-up.
Determine the position of the case and choose a
part of the case that will relate to the chalk line.
3. Adjust the case height using the adjustable feet
to ensure the case is level to within +/-1.5mm
from front to back, and side to side, and that the
chassis of case is NOT twisted. Maximum 30mm
adjustment.
Refer to and follow the manual handling policies of
your Company when moving cases.
Merchandisers must be installed level to ensure
proper operation of the refrigeration system and to
ensure proper drainage of defrost water. When leveling
merchandisers, use a carpenter's level as shown below.
PAGE 13
Cases must not be positioned in areas that may be
subject to heat or air currents such as ventilation ducts,
open doors or windows, direct sunlight, electric fans,
or ovens, etc.
NOTE:
Information in this manual
is to be followed in conjunction with
specifications, work practices and
regulations of the customer, installing
company, and relevant industry.
CAUTION:
of the trolley, etc., is sufficient for the
case. Refer to the product engineering
data tables at the front of this manual
for case weights and risk analysis
36).
The rating plates will also detail
weight/size.
FIGURE 3B - Levelling Feet
PMM20F3R MULTIDECK - HUSSMANN
Ensure the lifting capacity