Electrical Box Installation - Hussmann PMM20F3R Installation Manual

Medium temperature remote cabinet
Table of Contents

Advertisement

INSTALLATION
3.2

ELECTRICAL BOX INSTALLATION

1. Remove electrical box from the rear of the case.
2. If kickplate is installed, remove before continuing.
3. Slide the electrical box under the case to the front
ensuring that the front of the box (side with circuit
breakers) is facing the front as per Figure 3G.
4. Ensure there is enough room to work on the
electrical box before sliding out the front side of
the case.
5. Remove the lid from the electrical box by removing
the screws from the top of the box.
6. Hard-wire the power cable into the mains power
block as per Figure 3H.
7. Replace the lid and fasten screws removed in step
5.
8. Slide the electrical box back under the case
ensuring that it is seated in the rails as per Figure 3I.
9. Install the kickplate.
FIGURE 3G
Front of Electrical Box
FIGURE 3H
PAGE 16
Mains Power Block
Electrical Box Rails
PMM20F3R MULTIDECK - HUSSMANN
FIGURE 3I