Wiring - SMC Networks ZK2-ZS L A Series Operation Manual

Digital pressure switch for vacuum
Table of Contents

Advertisement

Wiring

■Wiring
○Connection
•Connections should only be made with the power supply turned off.
•Use separate routes for the Pressure switch wiring and any power or high voltage wiring. Otherwise,
malfunction may result due to noise.
•Ensure that the FG terminal is connected to ground when using a commercially available switch-mode
power supply. When a switch-mode power supply is connected to the product, switching noise will be
superimposed and the product specification can no longer be met. This can be prevented by inserting a
noise filter, such as a line noise filter and ferrite core, between the switch-mode power supply and the
product, or by using a series power supply instead of a switch-mode power supply.
○Connector use for pressure switch
Connecting/Disconnecting
•When mounting the connector, insert it straight into the socket holding the lever and connector body, and
push the connector until the lever hooks into the housing, and locks.
•When removing the connector, press down the lever to release the hook from housing and pull the
connector straight out.
ZK2□A
Pin assignment of the Connector for lead wire for IO-Link pressure switch
Pin No. Symbol
1
L+
2
-
3
L-
4
C/Q
Pin assignment for 4 pins A coded M12 connector
ZB
Content
+24V
N.C.
0V
IO-Link communication
ZL3/ZL6
Pin No. Symbol
5
4
OUT1 Output for release valve (white)
3
OUT2 Output for supply valve (white)
2
1
Pin assignment for 5 pins pressure switch connector
-14-
ZQ□A
Content
L+
+24V (brown)
C/Q
IO-Link communication (black)
L-
0V (blue)
Doc. No. DOC1051887

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zb1-zs l a seriesZl3-vp 1 l a seriesZq-zs l a series

Table of Contents