Inspect The Electrical Wiring - Genie Z-25/8 Service Manual

Hide thumbs Also See for Z-25/8:
Table of Contents

Advertisement

First Edition • Third Printing
B-2

Inspect the Electrical Wiring

Maintaining electrical wiring in good condition is
essential to safe operation and good machine
performance. Failure to find and replace burnt,
chafed, corroded or pinched wires could result in
unsafe operating conditions and may cause
component damage.
Electrocution hazard. Contact
with hot or live circuits could result
in death or serious injury. Remove
all rings, watches and other
jewelry.
1 Inspect the following areas for burnt, chafed,
corroded and loose wires:
· Electronic control module panel
· Hydraulic component tray
· Ground control panel
· Function manifold wiring
2 Turn the key switch to ground control and pull
out the Emergency Stop button to the
position.
Part No. 41314
ON
Genie Z-20/8N & Genie Z-20/8 & Genie Z-25/8
Section 4 • Scheduled Maintenance Procedures
TABLE B PROCEDURES
3 Raise the boom until the platform is 10 feet
(3 m) off the ground.
4 Inspect the boom storage area for burnt, chafed
and pinched cables.
5 Lower the boom to the stowed position and turn
the machine off.
6 Inspect the following areas for burnt, chafed,
corroded, pinched and loose wires:
· Boom to platform cable harness
· Inside of the platform control box
· Jib boom rotate manifold wiring
4 - 11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Z-20/8Z-20/8n

Table of Contents