YASKAWA Powerlink A1000 Series Installation Manual page 16

Ac drive
Hide thumbs Also See for Powerlink A1000 Series:
Table of Contents

Advertisement

5 Installation Procedure
Figure E.4
1 – Opening for network cables
(CIMR-A2A0004 to 0040,
4A0002 to 0023)
4.
Plug in the RJ45 network cable connector into the option.
The network can be established in star, tree, line or ring architecture.
5.
Reinstall the front cover back onto the drive as it was before.
Note: 1.
Take care when wiring the option card so that the front cover easily fits back
onto the drive.
2.
Install cable cover option to maintain the drive enclosure type integrity.
6.
Attach the LED label (10) packaged with the option as shown in
7.
Switch on the drive power supply.
An "AEr" Alarm message indicating that the node address is set to 0 will appear
on the drive display. Set the node address in parameter F6-72.
8.
Cycle the power supply to activate the changed settings. Installation complete.
 Communication Cable Specifications
To ensure proper performance, YASKAWA recommends using Powerlink dedicated Cat5e
communication cables.
EN 16
1
Wiring Routing
YASKAWA Europe YEU TOEP C710616 87A - A1000 Option Powerlink - Installation Manual
2
2 – Space for wiring
(CIMR-A2A0056 and above,
4A0031 and above)
Figure
E.3.

Advertisement

Table of Contents
loading

Table of Contents