Installation And Maintenance Schedule - Siemens VersiCharge 8EM1310-F.0 Series Operating Instructions Manual

Ac wallbox - erk
Table of Contents

Advertisement

NOTE
Additional information on personal protection
Follow deviating local regulations.
According to IEC 61851-1, a 30 mA RCCB Type A is sufficient due to the 6 mA DC fault current
monitoring integrated in the Wallbox.
The listed product recommendations relate to RCCBs with immediate tripping. Components
with delayed tripping (KK01 variant) are also suitable for installation in households and offer
an additional degree of ruggedness.
NOTE
Additional information on wiring protection
The tripping characteristic C is recommended for applications with high startup current and
power peaks. The tripping characteristic D is available optionally.
Depending on the installation case and country-specific regulations, different pole
configurations may be required. The recommended products relate to household
applications. MCBs of the 5SY4 and 5SY6 series are recommended for systems with multiple
Wallboxes for additional protection.
Additional information is available here (https://mall.industry.siemens.com/).
A.3

Installation and maintenance schedule

Introduction
Depending on the area of application, perform the general cleaning work and maintenance
work every 6 months. Shorten this interval according in the event of difficult usage
conditions.
Follow the regionally valid regulations on servicing and maintaining this type of electrical
charging equipment.
NOTE
Compliance with calibration laws
The calibration period is eight years and begins with placement on the market (see Article 37
of the German Weights and Measures Act, MessEG).
Cleaning
Clean dirt, dust and residues from the Wallbox and the operating area. Wipe the surfaces with
a damp cloth. For stubborn stains, use a cleaning agent containing alcohol. Do not clean the
device with a pressure washer. Do not use aggressive cleaning agents.
VersiCharge AC Wallbox Operating Instructions ERK
Operating Instructions, 08/2023, A5E51549696-AC
A.3 Installation and maintenance schedule
Appendix
75

Advertisement

Table of Contents
loading

Table of Contents