Siemens VersiCharge 8EM1310-F.0 Series Operating Instructions Manual page 76

Ac wallbox - erk
Table of Contents

Advertisement

Appendix
A.3 Installation and maintenance schedule
Check
Check the Wallbox for the following:
• Cuts, damage and soiling
• Defects and rust
• Clearly visible signs of faded colors
• Residue or damage on the cables, cable holders and plugs
• Signs of rust at the charge coupling pins
• Accumulation of snow around the Wallbox
Contact the supplier if you notice any anomalies.
Avoid accumulation of snow around the Wallbox. Clear the area accordingly. In heavy
snowfall, clear the area daily.
Wallbox checklist
The following table shows the tasks and their expected duration for the following
applications:
• Installation/assembly
• Commissioning
• Maintenance
Table A-1  Installation and maintenance schedule
Action
Mark and drill holes
Mount Wallbox
Assemble and connect the connection cable
Visual and functional check for mechanical damage
Type 2 coupling or cover
Housing
Commissioning with the mobile app / PC tool
Check
Fault message
Backend connection (e.g. Siemens Device Management)
SIM card
Cleaning
Check charging sockets or charging cables
Charging cable and charge coupling for damage
Measurements acc. to DIN VDE, e.g.:
Insulation measurement
Grounding resistance measurement
Loop impedance measurement
Generate maintenance log
Function test
Trial charge (with commercial or electric vehicle)
*Scope and duration may vary as they depend on local regulations.
76
Installa­
Commis­
Mainten­
tion/asse­
sioning
mbly
x
x
x
x
x
x
x
x
x
x
VersiCharge AC Wallbox Operating Instructions ERK
Operating Instructions, 08/2023, A5E51549696-AC
Duration
ance
in min.
5
10
15
x
1
10
x
5
x
5
x
2
x
25*
x
15*
x
10*

Advertisement

Table of Contents
loading

Table of Contents