7 .
Bottom Entry Wiring. Route the battery detect and shunt trip wiring from the battery cabinet or battery
disconnect through the bottom of the UPS to the UPS battery detect and shunt trip terminals. See
Figure 4-4 for UPS wiring access information and Figure 4-15 for UPS terminal locations. Refer to the
Eaton 93PM Integrated Battery Cabinet Installation Manual-Large and Large High Rate, the Eaton 93PM
Universal Integrated Battery Cabinet Installation Manual-Large and Large High Rate, or the Eaton 93PM
Integrated Battery Cabinet Installation Manual-Small, listed in paragraph 1.8, for battery cabinet wiring
access information and instructions.
8.
Proceed to Step 10.
9.
Top Entry Wiring. Route the battery detect and shunt trip wiring from the battery cabinet or battery
disconnect through the top of the UPS sidecar and the bottom UPS inter-cabinet wiring access
pass-through to the UPS battery detect and shunt trip terminals. See Figure 4-5 and Figure 4-6 for UPS
wiring access information, and Figure 4-15 for UPS terminal locations. Refer to the Eaton 93PM Integrated
Battery Cabinet Installation Manual-Large and Large High Rate, the Eaton 93PM Universal Integrated
Battery Cabinet Installation Manual-Large and Large High Rate, or the Eaton 93PM Integrated Battery
Cabinet Installation Manual-Small, listed in paragraph 1.8, for battery cabinet wiring access information
and instructions.
10. Connect the wiring to the battery detect and shunt trip terminals. See paragraph 3.2.4 and Table 4-3 for
wiring and termination requirements, and Figure 4-16 for terminal assignments.
11. Verify jumpers are in position as shown in Figure 4-17. If jumpers are not installed or are in the incorrect
position, move or install the jumpers as shown in the figure.
12. If wiring thermal sensor connections, proceed to paragraph 4.7 .3; if wiring generator interface
connections, proceed to paragraph 4.7 .4; if wiring external parallel CAN connections, proceed to paragraph
4.7 .5; if wiring external parallel pull chain connections, proceed to paragraph 4.7 .6; if wiring Minislot
connections, proceed to paragraph 4.7 .7; if wiring REPO connections, proceed to paragraph 4.8;
otherwise, proceed to Step 13.
13. Reinstall all safety shield panels previously removed and secure with the retained hardware.
14. If removed, reinstall the sidecar front panel and secure with the retained hardware.
15. Close the UPS outside door and secure the latch.
Eaton 93PM UPS (20–50 kW, 480V Four Wire – 50 kW Frame) Installation and Operation Manual P-164000540—Rev 4
UPS System Installation
www.eaton.com/powerquality
4-17