Figure 4-5. Sidecar Conduit And Wire Entry Locations - Eaton 93PM UPS Installation And Operation Manual

20–50 kw (480v four wire) – 50 kw frame
Table of Contents

Advertisement

UPS System Installation

Figure 4-5. Sidecar Conduit and Wire Entry Locations

4-8
Eaton 93PM UPS (20–50 kW, 480V Four Wire – 50 kW Frame) Installation and Operation Manual P-164000540—Rev 4
www.eaton.com/powerquality

Advertisement

Table of Contents
loading

Table of Contents