3.10 Completing The Installation - Enterasys Matrix E1 Series Installation Manual

Hide thumbs Also See for Matrix E1 Series:
Table of Contents

Advertisement

Completing the Installation
RJ45
Pin
1
2
4
5
6
8
RJ45 Connector (Female)

3.10 COMPLETING THE INSTALLATION

After installing the 1G58x-09 and making the connections to the network, secure the cables by
running the cables along the strain-relief bracket and tying them to the strain-relief bracket using
cable ties.
Initial Logon to Device Management
You can now logon to the 1G58x-09 via the Console port and configure it using the command line
interface (CLI). To initially access device management from your local pc, terminal, or modem
connection, proceed as follows:
1. Enter rw (Read-Write) for Username.
2. At the Password prompt, press ENTER (RETURN).
For details on how to configure the 1G582-09 using the command line interface, refer to the
Matrix E1 Series (1G58x-09 and 1H582-xx) Configuration Guide. The CLI commands enable you
to initially set up and perform more involved switch management configurations.
3-34
Hardware Installation
Modem Port Adapter Wiring and Signal Diagram
Conductor
Blue
Orange
Red
Green
Yellow
Gray
Pins
1
8
DB25
Pin
Signal
2
Transmit (TX)
8
Data Carrier Detect (DCD)
3
Receive
7
Ground (GRD)
20
Data Terminal Ready (DTR)
22
Ring Indicator
1
14
DB25 Connector (Male)
Pins
13
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

1g582-091g587-09

Table of Contents