Toro 78555 Operator's Manual page 16

48in and 52in e-z vac twin bagging system or 60in and 72in e-z vac triple bagging system z master g3 mower
Table of Contents

Advertisement

Figure 24
1. Hood plate
2. Upper tube
3. Hood in the down position
7.
Once the 19 mm (3/4 inch) measurement has
been achieved, mark the upper tube on the
outside where the rubber seal protrudes out
(Figure
25).
Note:
This is marked to ensure the correct
position for the upper tube when drilling the
holes and connecting the upper and lower tubes.
Note:
The rubber seal must protrude out from
the bagger hood.
Figure 25
1. Upper tube
2. Rubber seal protruding out 4. Mark here against the
g003388
4. 19 mm (3/4 inch)
5. Edge of tube
g003393
3. Bagger hood
rubber seal
8.
Install the lower tube into the upper tube
26).
1. Lower tube
9.
Slide the lower tube onto the boot and latch
them together
Note:
There is a latch on the top and bottom
of the blower housing.
16
Figure 26
2. Upper tube
(Figure 27
or
Figure
28).
(Figure
g003424

Advertisement

Table of Contents
loading

This manual is also suitable for:

7856278563

Table of Contents