Fujitsu Airstage J-IVS AJ 040LCLDH Series Design & Technical Manual page 905

Hide thumbs Also See for Airstage J-IVS AJ 040LCLDH Series:
Table of Contents

Advertisement

• Installation abstract
Electricity meter connection methods mentioned here can be adapted for the System controller
and Touch panel controller (TPC). However, the setting restrictions mentioned here must be ob-
served.
– Multiple VRF networks can be connected to 1 electricity meter. (with network crossover)
NOTE: Combination of UTY-ALGXZ1 and UTY-PLGXE2 does not multiple VRF networks.
Whm
– With the electricity charge apportionment function, an electricity meter system cannot span TPC.
Whm
Whm
Whm
Whm
Whm
Whm
Whm
2-30. Electricity charge apportionment setting (System controller, Touch panel
controller)
VRF network system 1
VRF network system 2
VRF network system 3
TPC1 management range
TPC1
TPC2
TPC2 management range
TPC1 management range
TPC1
TPC2
TPC2 management range
- (07-159) -
Whm
VRF network system 1
VRF network system 2
Whm
VRF network system 3
Whm
Create an electricity meter system within
the range of the units managed by each
TPC.
An electricity meter system spanning units
managed by TPC cannot be created.
2. Function settings

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airstage j-ivs aj 054lcldh seriesAirstage j-ivs aj 045lcldh seriesAirstage j-ivs auxb004glehAirstage j-ivs auxb007glehAirstage j-ivs auxb009glehAirstage j-ivs auxb012gleh ... Show all

Table of Contents