Nortel 1000 Hardware Installation Manual page 34

Application gateway
Table of Contents

Advertisement

Chapter 3
Hardware Installation and Initial Configuration
Connecting and Powering up the Application Gateway
6
7
8
9
10
1
2
3
4
5
26
Application Gateway Hardware Installation Guide
Link - Green LED, Ethernet port active.
100 Mbps - Green LED on, Ethernet port running at 100 Mbps; LED
off, Ethernet port running at 10 Mbps.
A console window appears on the maintenance terminal.
When the maintenance terminal screen displays an instruction for
entering setup mode, follow that instruction.
Use the command line to change the boot sequence to (1) CD and (2) hard
drive.
Change the baud rate to 9600 (required for Application Gateway
operation).
Insert the Application Gateway CD-ROM into the CD-ROM drive.
Save the setup changes and exit setup mode. The Application Gateway
will restart.
After a couple of minutes, the Application Gateway Serial Console
appears on the maintenance terminal. If you see garbage characters on the
terminal, the baud rate is not set to 9600.
You are now ready to configure the Application Gateway with your
network.
To configure the Application Gateway using a serial console:
In the Application Gateway serial console, enter the default login root and
the default password rootadmin.
Type 0 and press Enter to choose Express Setup.
Enter the IP address and netmask for Interface 0 when prompted.
The Application Gateway does not work with Dynamic Host
Note
Configuration Protocol (DHCP). You must use static IP addresses
for the Application Gateway.
Enter the IP address of the gateway device when prompted.
A list of the settings displays.
Verify that the settings are correct.
If they are correct, type y when asked to commit your changes. The
Application Gateway restarts and displays the login prompt.

Advertisement

Table of Contents
loading

Table of Contents