Nortel 1000 Hardware Installation Manual page 30

Application gateway
Table of Contents

Advertisement

Chapter 3
Hardware Installation and Initial Configuration
Connecting and Powering up the Application Gateway
3
22
Application Gateway Hardware Installation Guide
-
The P1 port (interface 0) is the bottom one of the two network interfaces
shown in
Figure
11.
The P2 port (interface 1) is the top one of the two network interfaces shown
in
Figure
11.
Back of Application Gateway
Power
P2
(Interface 1)
Connect a maintenance terminal to the Application Gateway.
Connect a DTE-DTE null modem serial cable (supplied with the
a.
Application Gateway) from the Serial Port on the back of the
Application Gateway to a maintenance terminal. The connection looks
like that shown in
Figure 12
Application Gateway connection to Terminal
Maintenance Terminal
P1
(Interface 0)
Figure 12 on page
22.
Serial Cable
Admin/Serial Port
553-

Advertisement

Table of Contents
loading

Table of Contents