Nortel 1000 Hardware Installation Manual page 33

Application gateway
Table of Contents

Advertisement

Figure 15
Application Gateway indicators and power switch
Power
Status
LED
LED
Port 1 (ELAN
network interface)
Link
100Mbps
Drive
LED
LED
LED
Power
switch
The Application Gateway LED indicators show the following:
Power - Green LED on, power on; LED off, power off.
Status - Red LED off, CPU running; LED on, CPU halted.
Drive - Green LED flashing, Hard Drive or CD ROM Drive active.
Chapter 3
Hardware Installation and Initial Configuration
Connecting and Powering up the Application Gateway
Port 2 (TLAN
network interface)
Link
100Mbps
LED
LED
Reset
INI
switch
switch
Application Gateway Hardware Installation Guide
U2
U1
LED
LED
553-AAA0107
25

Advertisement

Table of Contents
loading

Table of Contents