Nortel BCM200 Integration Manual page 13

Solution integration guide for multisite business communications manager systems
Hide thumbs Also See for BCM200:
Table of Contents

Advertisement

Use
baselines prior to integration.
Table 3
Pre-integration checklist
Task
BCM configuration is
complete and passing data
traffic.
BCM networking hardware
is installed for integration.
PEC III Media Service Cards
(MSC) are later.
Solution Integration Guide for Multisite Business Communications Manager Systems
Copyright © 2007, Nortel Networks
.
Table 3 "Pre-integration checklist" (page
Reference
Enterprise: Common
NN49000-303 01.01 Standard
Release 4.0, 3.7 29 June 2007
Establishing the system baseline 13
13)to complete system
Comments
To check the installed
hardware:
1 Log on to Element
Manager.
2 Select the Administration
tab.
3 Expand the General
folder.
4 Select Hardware
Inventory.
5 Select the PCI Cards tab.
The cards installed in BCM
are listed.
PECIII MSCs are required
for T.38 Fax and IP
telephony.
To check the PEC hardware:
1 Log on to Element
Manager.
2 Select the Administration
tab.
3 Expand the General
folder.
4 Select Hardware
Inventory.
5 Select the PCI Cards tab.
6 Select the MSC PCI
card and scroll down to the
Details for Card section.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bcm50Bcm400

Table of Contents