34. Have an assistant hold saw head in place
while you attach it to post sleeves with (6)
M10-1.5 x 16 hex bolts and
(see Figure 35).
Post Sleeve
Post Sleeve
(1 of 2)
Figure 35. Saw head attached to post sleeves.
35. Loop end of lift cable A around anchoring hex
bolt, as shown in Figure 36, and secure with
(1) cable clamp.
Lift Cable
A
Cable Clamp
Figure 36. First end of lift cable A secured
(switch panel removed for clarity).
Model G0960 (Mfd. Since 09/22)
⁄
" flat washers
3
8
(1 of 2)
Saw Head
x 6
Anchoring Hex Bolt
36. Route lift cable A around pulley A, pulley B,
and pulley C (see Figure 37), then loop lift
cable end around upper cable plate hex bolt
shown in Figure 38 and secure with (1) cable
clamp.
Note: Pulley A and pulley B are upper pulleys
on lift assembly.
A
Figure 37. Lift cable A routed around pulleys
(switch panel removed for clarity).
Upper
Hex Bolt
Figure 38. Second end of lift cable A secured.
C
B
Cable Clamp
-25-