Grizzly G0960 Owner's Manual page 24

Mini sawmill pro
Table of Contents

Advertisement

17. Insert log clamps in receivers and secure
with (2)
"-18 x
5
5
16
Figure 23.
Figure 23. Log clamp installed in receiver.
18. Insert log supports in log bunks and secure
with (2)
"-18 x
5
5
16
Figure 24.
19. Thread remaining
log bunk shown in Figure 24.
x 3
Figure 24. Log supports installed.
-22-
" knob bolts, as shown in
8
Log
Clamp
" knob bolts, as shown in
8
"-18 x
" knob bolt into
5
5
16
8
Log
Supports
20. Install (1) M12-1.75 x 35 hex bolt, 12 x 17 x
15mm spacer, and M12-1.75 lock nut at each
rail corner (see Figure 25).
x 4
Figure 25. Rail spacer stops installed.
21. Slide front posts through post sleeves, as
shown in Figure 26.
Front Post
Figure 26. Post sleeves installed on front posts.
22. Attach front posts to carriage legs with (4)
M10-1.5 x 80 hex bolts, (8)
ers, and (4) M10-1.5 hex nuts, as shown in
Figure 27. Hand-tighten all fasteners until
told otherwise later.
Note: Cable plates on post sleeves should
face up and away from wheels of carriage
legs (see Figure 27).
Model G0960 (Mfd. Since 09/22)
Post Sleeve
" flat wash-
3
8

Advertisement

Table of Contents
loading

Table of Contents