Install The New Power Supply - Comtech EF Data HPOD Installation And Operation Manual

C, x, ku-bandhigh power outdoor amplifier
Hide thumbs Also See for HPOD:
Table of Contents

Advertisement

C.2.2 Install the New Power Supply
To install the new power supply, do these steps:
Step
Task
Visually inspect the exposed SSPA heat sink for any debris or blockage. Use compressed air
1
to clean and clear as needed.
2
Visually inspect both the SSPA and power supply connector for cleanliness or damage. Clean
and correct as required.
3
Inspect the gasket for damage. Replace as required.
4
Install the power supply onto the SSPA. Make sure that the guide pins and connection are
properly aligned. Gently press to engage the connector.
5
Tighten the four captive fasteners where shown previously in Figure C-1.
6
Reconnect the HPOD SSPA to its power source.
Appendix C
Be sure to use an appropriate screwdriver, such as the one provided
with the SSPA, to avoid damaging the fasteners.
C–3
HPOD C-, X-, Ku-Band High-Power Outdoor Amplifier
Revision 9
MN/HPOD.IOM

Advertisement

Table of Contents
loading

Table of Contents