5.
Carefully position the cabinets upright (see Figure 14).
NOTE The EBM must be installed to the right of the UPS. The PDM must be installed
between the UPS and EBM, as shown in Figure 14.
UPS
6.
Align each joining bracket (provided in the EBM accessory kit or
PDM carton) with the adjacent cabinet screw holes and secure with
the supplied screws (see Figure 15).
®
EATON Powerware
9125 (9910-E64) UPS Installation Guide for IBM
EBM
UPS
Figure 14. UPS Tower Configuration
®
Applications
INSTALLATION
PDM
EBM
S
15
164201697 Rev 1