12. Loosen the wing nut on the rear hold-down bracket and slide the
bracket into the slot on the UPS rear panel.
Verify that the rear hold-down bracket is fully seated and then
tighten the wing nut.
13. Tighten the pan-head screws that secure both rails to the front of
the rack (see Step 3 on page 6).
14. Repeat Steps 12 and 13 for each cabinet.
15. Continue to the following section, "Installing the Internal Batteries."
®
EATON Powerware
9125 (9910-E64) UPS Installation Guide for IBM
Figure 8. Securing the Back of the UPS
®
S
Applications
INSTALLATION
Rear Hold-Down
Bracket
11
164201697 Rev 1