INSTALLATION
5.
6.
8
EATON Powerware
Figure 5. Securing the Rear of the Rail
Repeat Steps 3 and 4 for the other rail.
Tighten the assembly wing nuts on all rail assemblies.
®
9125 (9910-E64) UPS Installation Guide for IBM
Clip Nuts
®
S
Applications
164201697 Rev 1