Eaton Powerware 9125 Installation Manual page 10

Hide thumbs Also See for Powerware 9125:
Table of Contents

Advertisement

INSTALLATION
3.
NOTE Do not tighten the screws until the UPS or EBM is installed.
6
EATON Powerware
Figure 2. Front Rack Screw Positions
Secure the rail to the front of the rack with two pan-head screws
and one adapter plate. Insert the screws through positions 3 and 4
of the rail (see Figure 3).
®
9125 (9910-E64) UPS Installation Guide for IBM
Position 15
Second Rail
Position 10
Position 6
First Rail
Position 1
®
S
Applications
164201697 Rev 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

9910-e64

Table of Contents