Eaton Powerware 9125 Installation Manual page 14

Hide thumbs Also See for Powerware 9125:
Table of Contents

Advertisement

INSTALLATION
The UPS chassis (35 kg/77 lb) an
are required to lift the cabinets into the rack.
NOTE The EBMs must be installed below the UPS as shown in Figure 7.
10. Slide the UPS and any optional cabinets into the rack.
11. Secure the front of the UPS to the rack using two pan-head screws
UPS
Optional
EBM
Optional
EBM
10
EATON Powerware
d
in the top and bottom positions of each mounting bracket (see
Figure 7). Repeat for each cabinet.
Figure 7. Securing the Mounting Brackets
®
9125 (9910-E64) UPS Installation Guide for IBM
C A U T I O N
EBM (69.9 kg/154 lb) are heavy. A minimum of two people
Pan-Head
Screws
®
S
Applications
164201697 Rev 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

9910-e64

Table of Contents