Cisco Catalyst 2955 Hardware Installation Manual page 296

Cisco systems switch installation guide
Hide thumbs Also See for Catalyst 2955:
Table of Contents

Advertisement

Index
removing the switch from parallel and
face-down mounted
positions
3-59 to 3-61, 4-45 to 4-46
restricted area warning
S
safe operating voltage range
warning
C-9 to C-10
safety agency approvals
safety warnings
3-2 to 3-6, 4-2 to 4-7, C-1 to C-76
SELV-IEC 60950 DC power supply
warning
C-44
service personnel warning
servicing warning
C-58 to C-66
SNMP network management platforms
software switch management
specifications
A-1 to A-5
stacking the chassis warning
straight-through cable
connecting to
10/100/1000 ports
10/100 ports
3-63, 4-48
connectivity problems
pinout
four twisted-pair, 10/100 ports
four twisted-pair, 1000BASE-T ports
two twisted-pair
SunNet Manager
2-20
supply wires warning
C-32 to C-33
Catalyst 2955 Hardware Installation Guide
IN-8
C-69
A-3, A-5
3-2, 4-2, C-39
2-20
2-19 to 2-20
C-39, C-41 to C-42
3-63, 4-48
5-5
B-7
B-8
B-6
3-3, 3-32, 3-42, 4-4,
switch, power-on
3-13 to 3-27, 4-16 to 4-30
switch relays warning
T
technical specifications
Telnet, and accessing the CLI
temperature
operating
A-2, A-4
warning
3-3, 4-5
terminal, connecting to a switch
4-14 to 4-16, B-10
terminal-emulation software
translated warnings
C-1 to C-76
troubleshooting
5-1
diagnosing problems
understanding POST results
U
uplink ports
LEDs
2-14 to 2-15
V
verifying package contents
4-12 to 4-13
verifying switch operation
4-14 to 4-32
C-11 to C-14
A-1 to A-5
2-19
3-11 to 3-13,
1-5, 3-12, 4-15
5-3 to 5-5
5-2
3-9 to 3-10,
3-11 to 3-29,
78-14944-03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents