Cisco Catalyst 2955 Hardware Installation Manual page 158

Cisco systems switch installation guide
Hide thumbs Also See for Catalyst 2955:
Table of Contents

Advertisement

Verifying Switch Operation
Figure 4-7
1
2
3
4
Use a ratcheting torque flathead screwdriver to torque the power and relay
Step 6
connector captive screws (above the installed wire leads) to 4.5 in-lbs. (72
ozf-in.). (See
Do not overtorque the power and relay connector captive screws. The
Caution
recommended maximum torque is 4.5 in-lbs.
Catalyst 2955 Hardware Installation Guide
4-24
Inserting Wires in the Power and Relay Connector
1
2
Power supply A positive
connection
Power supply A return
connection
External device 1, relay wire A
connection
External device 2, relay wire A
connection
Figure
4-8.)
Chapter 4
Installation in a Hazardous Environment
3
4
5
6
7
8
5
External device 2, relay wire B
connection
6
External device 1, relay wire B
connection
7
Power supply B return
connection
8
Power supply B positive
connection
78-14944-03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents