Cisco NPE-175 Installation And Configuration Manual page 202

Network processing engine and network services engine
Table of Contents

Advertisement

Removing and Replacing the NPE or NSE
Figure 9-24
3
1
Power switch
2
Power receptacle
3
Captive installation screw
4
M5 grounding receptacles
5
M5 grounding lug
Step 9
Restore current to the –V and +V leads.
Note
Repeat Step 1 through Step 9 if a second power supply is installed.
Step 10
This completes the steps for reconnecting DC-input power to a Cisco uBR7246VXR router. Proceed to
the following section,
Network Processing Engine and Network Services Engine Installation and Configuration
9-32
Replacing the Strain-Relief Cover on a Cisco uBR7246VXR Router DC-Input Power
Supply
4
5
For the Cisco uBR7246VXR router, each DC-input power supply rating is 14A, 700 volt ampere
(VA).
This product relies on the building's installation for short-circuit (overcurrent) protection.
Ensure that a listed and certified fuse or circuit breaker, 35A minimum 60 VDC, is used on all
current-carrying conductors. Site wiring and circuit breakers need to be sized to accommodate
the maximum values for safety reasons.
"Powering Up the
1
2
6
7
6
–V lead
7
+V lead
8
Strain-relief cover
9
M4 nuts
Router."
Chapter 9
Removing and Installing the NPE or NSE
8
9
OL-4448-12

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents