Installing and cabling the G650 Media Gateway
Installing the G650 Media Gateway
This section includes the following tasks, which you must perform to install the G650 Media
Gateway PN:
Checking the ventilation and the G650 Media Gateway rack
●
Setting the carrier address ID
●
Mounting one G650 Media Gateway
●
Mounting two to five G650 Media Gateways
●
Installing the TN2312BP IPSI adapter
●
Approved ground
●
Connecting the G650 Media Gateway grounds and other grounds
●
Connecting to AC power
●
Connecting to DC power
●
Using an uninterruptible power supply
●
G650 Media Gateway power switch
●
Figure 2: G650 Media Gateway stack (A through E) that is installed next to the media server
rack
on page 19 shows a typical Communication Manager installation.
18 Installing the Avaya G650 Media Gateway
on page 21
on page 22
on page 28
on page 29
on page 31
on page 35
on page 38
on page 39
on page 20
on page 27
on page 30