UPS installation plan and unpacking
4 4 . . 1 1
A A b b o o u u t t U U P P S S i i n n s s t t a a l l l l a a t t i i o o n n
Use the following basic sequence of steps to install the UPS:
1. Create an installation plan for the UPS system.
2. Prepare your site for the UPS system.
3. Inspect and unpack the UPS cabinet.
4. Unload and install the UPS cabinet and wire the system.
5. Complete the installation checklist provided in Section
6. Have authorized service personnel perform the preliminary operational checks and startup.
Startup and operational checks must be performed by an authorized Eaton Customer Service
NOTE:
Engineer or by other qualified service personnel authorized by Eaton, or the terms specified in the
Warranty (see Section
part of the sales contract for the UPS. Contact service in advance (usually a two-week notice is required)
to reserve a preferred startup date.
4 4 . . 2 2
C C r r e e a a t t e e a a n n i i n n s s t t a a l l l l a a t t i i o o n n p p l l a a n n
Before you install the UPS system, read and understand how these instructions apply to the system that
you are going to install. Use the procedures and illustrations in Section
About UPS system installation to create a logical plan for installing the system.
5.1
4 4 . . 3 3
I I n n s s t t a a l l l l a a t t i i o o n n c c h h e e c c k k l l i i s s t t
Action
All packing materials and restraints are removed from each cabinet.
Each cabinet in the UPS system is placed in its installation location.
A cabinet grounding kit / mounting kit is installed between any cabinets that are
bolted together.
All conduits and cables are properly routed to the UPS and to any ancillary
cabinets.
All power cables are properly sized and terminated.
Neutral conductors are installed according to the requirements.
A ground conductor is properly installed.
Battery cables are terminated and connected to battery connectors.
Battery Shunt trip and Aux contact signal wiring is connected from the UPS to the
battery breaker.
EATON 93PM G2 UPS
USER'S AND INSTALLATION GUIDE
General information about warranty) become void. This service is offered as a
10.1
Installation checklist.
4.3
Site preparations and Section
4.4