To install the 4-way valve coil
RZA200+250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
3 Wrap a wet rag around the 4‑way valve and solder the 4‑way valve pipes to
the 4‑way valve.
CAUTION
Overheating the valve will damage or destroy it.
4 After soldering is done, stop the nitrogen supply after the component has
cooled‑down.
a
4‑way valve pipe
b
4‑way valve
5 Install the putty (if available) and the insulation (if available) in their original
location.
6 Install the 4‑way valve coil on the 4‑way valve body, see
4
procedures" [
 53].
7 Add
refrigerant
4
procedures" [
 142].
1 Install the 4‑way valve coil on the 4‑way valve body.
a b
a
Screw
b
4‑way valve coil
a
b
a
to
the
refrigerant
c
3
Components
|
"3.1.2  Repair
circuit,
see
"4.2.2  Repair
Service manual
55

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sky air advance rza250d7y1b

Table of Contents