Daikin Sky Air Advance RZA200D7Y1B Service Manual page 100

Hide thumbs Also See for Sky Air Advance RZA200D7Y1B:
Table of Contents

Advertisement

3
|
Components
To remove a fuse of the main PCB
To install a fuse on the main PCB
Service manual
100
WARNING
When reconnecting a connector to the PCB, do NOT apply force, as this may damage
the connector or connector pins of the PCB.
Is the problem solved?
Yes
No
Prerequisite: Stop the unit operation via the user interface.
Prerequisite: Turn OFF the respective circuit breaker.
Prerequisite: Remove the required plate work, see
1 Remove the fuse from the PCB.
b
a
c
a
Fuse F1U
b
Fuse F2U
c
Fuse F3U
2 To install a fuse on the main PCB, see
WARNING
For continued protection against risk of fire, replace only with same type and rating
of fuse.
1 Install the fuse on the correct location on the PCB.
CAUTION
Make sure the fuse is plugged‑in correctly (contact with the fuse holder).
Action
No further actions required.
Return to
"3.9.1 Checking
4
procedures" [
 95] of the PCB and
continue with the next procedure.
"3.12 Plate
work" [
"3.9.2 Repair
procedures" [
4
 111].
4
 98].
RZA200+250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sky air advance rza250d7y1b

Table of Contents