Daikin Sky Air Advance RZA200D7Y1B Service Manual page 117

Hide thumbs Also See for Sky Air Advance RZA200D7Y1B:
Table of Contents

Advertisement

RZA200+250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
a
Thermal interface grease on heat sink
3 Install the switch box on the correct location in the outdoor unit. Take the
following into account:
▪ Route the DC fan motor harness in front of the switch box to easily connect
it later on.
▪ Route the compressor wiring harness (Faston connectors) downwards
between the compressor body and the discharge pipe.
▪ Guide the sheet metal plate of the service port behind the switch box
mounting plate to correctly install the service port and avoid pipe bending.
▪ Slightly tilt the heat sink forward (±10°) and avoid that the thermal interface
grease gets smeared everywhere.
▪ Hook the switch box mounting plate in the support plate on the right hand
side.
4 Install the hooks of the switch box supporting plate in the openings of the
switch box.
c
a
Screw
b
Switch box supporting plate
c
Switch box
5 Install and tighten the 2 screws to fix the switch box supporting plate to the
unit.
a
b
3
Components
|
a
a
Service manual
117

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sky air advance rza250d7y1b

Table of Contents