Wiring Diagram; Wiring Diagram: Outdoor Unit - Daikin Sky Air Advance RZA200D7Y1B Service Manual

Hide thumbs Also See for Sky Air Advance RZA200D7Y1B:
Table of Contents

Advertisement

6.2 Wiring diagram

6.2.1 Wiring diagram: Outdoor unit

RZA200+250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
The wiring diagram is delivered with the unit, located at the inside of the service
cover.
(1) Connection diagram
English
Connection diagram
Only for ***
See note ***
Outdoor
Indoor
Upper EEV
Lower EEV
Fan
ON
OFF
(2) Layout
English
Layout
Front
Left
Back
Position of compressor terminal
(3) Notes
English
Notes
X1M
NOTES:
6
Technical data
|
Translation
Connection diagram
Only for ***
See note ***
Outdoor
Indoor
Upper electronic expansion valve
Lower electronic expansion valve
Fan
ON
OFF
Translation
Layout
Front
Left
Back
Position of compressor terminal
Translation
Notes
Connection
Indoor/outdoor communication
Earth wiring
Field supply
Protective earth
Field wire
Wiring depending on model
Option
Switch box
PCB
Service manual
151

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sky air advance rza250d7y1b

Table of Contents