Arrow Storage Products RV101467H2 Owner's Manual & Assembly Manual page 22

Table of Contents

Advertisement

Step 6: Corners
You will need for this page:
(QTY: 34)
(QTY: 4)
Place washers on all bolts and screws used
on painted parts.
Use one person to support the Corner while
another secures the Panels. Do not leave the
Corner unsupported until it is secure.
1
Working one Corner at a time, attach the Corners to the
Floor Frame in the position shown using three (3) screws per
Corner. The widest part of each Corner must be placed along
the side of the building for all four (4) Corners.
2
Attach the Front Wall Panels to the front Corner Panels with
a screw in the top and bottom of each Panel and a bolt and nut
through the middle hole of each Panel. Place screws through
all holes along the bottom of the Panels, but leave the hole closest to
the Ramp open in each Front Panel as shown.
3
Attach the Wall Panels to the rear Corner Panels with a screw
in the top and bottom of each Panel and a bolt and nut through
the middle hole of each Panel. Place screws through all holes
along the bottom of the Panels.
Double check the part numbers
indicated on the Panels. Front Wall
Panels (9374) must be installed along
front of building and Wall Panels
(6627) must be installed along rear of
building.
Wall Panels ALWAYS attach to the Floor Frames
with screws in the manner shown above. Rest
the panel on the Floor Frame and the holes in the
Panel should line up with the holes in the frame.
6627
Wall Panel
Be cautious when
maneuvering and placing
Panels. Once Panels
begin to go up it is
important to be able to
fi nish in a timely manner
to reduce the possibility
of wind damage to your
building.
10533
Leave these holes open.
9374
FRONT
2
2
9374
Front Panel
10533
10533
9374
10533
9374
Bolt
22
4
10533
Corner Panel
6627
FRONT
6627
10533
22BF
6627
10533
10533
9374
6627
10533

Advertisement

Table of Contents
loading

Table of Contents