Arrow Storage Products RV101467H2 Owner's Manual & Assembly Manual page 13

Table of Contents

Advertisement

Step 1: Floor Frames
You will need for this page:
(QTY: 8)
Overlap two (2) Side Floor Frames as shown
1
and secure with four (4) bolts. Two (2) bolts
must enter from bottom.
2
Assemble a second Side Floor Frame
Assembly by repeating part 1. Check that the
fi nished length of the Assemblies is 158 5/8"
(402,9 cm). Set aside for use in Step 5.
158 5/8" 402,9 cm
Finished Length
4
10387
Side Floor
Frame
Bolts thru Top.
13
Washers are to be used on painted parts only.
Washers are not necessary on unpainted parts
and there are not enough to use on every screw
and bolt.
BUILD TWO (2) FRAMES
10387
Bolts thru Bottom.
13BF
10387

Advertisement

Table of Contents
loading

Table of Contents