Advertisement

Quick Links

721800116
Owner's Manual
& Assembly Guide
Gloves must be worn
at all times to reduce
risk of injury!
Customer Service:
1-800-851-1085
assist@arrowsheds.com
BUILDING DIMENSIONS
Approx.
Storage
Size
10' x 14'
129 Sq. Ft. 905 Cu. Ft.
3,0 m x 4,0 m
12,0 m
* See Inside for Detailed Safety Information.
or
Size rounded off to the nearest foot
Exterior Dimensions
(Roof Edge to Roof Edge)
Area
Width
123 1/4"
2
25,6 m 3
313,1 cm
Depth
Height
Width
162 3/4"
92 7/8"
118 1/4"
413,4 cm
235,9 cm
300,4 cm
www.arrowsheds.com
Model No.
10' x 14'
Base
121" x 160 1/4"
Size
307,3 cm x 407,0 cm
For proper base construction see page 12
Interior Dimensions
(Wall to Wall)
Depth
Height
157 1/2"
91 5/8"
400,1 cm
232,7 cm
01BF
RV101467H2
Nominal Size
Door
Opening
Width
Height
55 1/2"
65"
141,0 cm
165,1 cm

Advertisement

Table of Contents
loading

Summary of Contents for Arrow Storage Products RV101467H2

  • Page 1 721800116 01BF Owner’s Manual & Assembly Guide www.arrowsheds.com Gloves must be worn at all times to reduce Model No. RV101467H2 risk of injury! 10’ x 14’ Nominal Size Customer Service: 1-800-851-1085 Base 121” x 160 1/4” assist@arrowsheds.com Size 307,3 cm x 407,0 cm BUILDING DIMENSIONS †...
  • Page 2 SAFETY PRECAUTIONS... Safety precautions MUST be followed at all times throughout the construction of your building! Practice caution with the tools being used in the Care must be taken when handling various pieces assembly of this building. Be especially familiar with of your building since many contain sharp edges.
  • Page 3: What You Need

    ASSEMBLY TIPS & TOOLS Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building.
  • Page 4: Frequently Asked Questions

    FREQUENTLY ASKED QUESTIONS How long will it take to assemble the building? Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly.
  • Page 5 What kind of base do I use? You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/fl oor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/fl oor, an Arrow fl...
  • Page 6: Customer Service

    What if the rear wall angle and channels are too large to fi t inside of the rear wall panels? Check the dimensions of wall assemblies. They should be slightly smaller than the fl oor frames. Lay the assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward.
  • Page 7 HARDWARE LIST... 07BF Hardware Views by Key No. Part Part Qty. Description #2 Phillips List 11/32 Hex. 65103 Hex Nut (#8-32) 65923 Small Bolt (#8-32 x 3/8) (10 mm) 65004 Small Screw (#8AB x 5/16) (8 mm) 65900A Black Screw (#10B X 1/2) (13 mm) #2 Phillips #2 Phillips 65109...
  • Page 8 PARTS LIST... 08BF Part Part Qty. Selected End Views by Key No. Description List 3719 Door Handle Brace 6085 Roof Beam Bracket 6227 Roof Beam Brace 6636 Gable Brace 9365 Front Wall Channel 10497 Horizontal Door Brace 5986 Rear Wall Angle 6015 Side Roof Trim 10533 Corner Panel...
  • Page 9 ASSEMBLY BY KEY NO. 09BF Walls Floor...
  • Page 10 ASSEMBLY BY KEY NO. 10BF Roof 30 30 Doors...
  • Page 11: Assembly Overview

    ASSEMBLY OVERVIEW 11BF Install Corners, Wall Angles, and Door Build the Floor Frame Track Attach Gables and Roof Beams Install Wall Panels, Wall Channels, and Door Jambs Install Roof Panels, Ridge Cap, Side Install Doors Trim, and Corner Cap Shed is now complete.
  • Page 12 CONSTRUCTING A BASE... 12BF No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.).
  • Page 13 Step 1: Floor Frames 13BF Washers are to be used on painted parts only. You will need for this page: Washers are not necessary on unpainted parts 10387 and there are not enough to use on every screw and bolt. Side Floor (QTY: 8) Frame...
  • Page 14 Step 1: Continued You will need for this page: 8936 Rear Floor (QTY: 5) Frame 8936 Assemble the Rear Floor Frames. Overlap two (2) Rear Floor Frames as shown and secure with fi ve (5) bolts. Two (2) bolts must enter from bottom. Check that the fi...
  • Page 15 Step 1: Continued You will need for this page: 119 3/8” 303,2 cm 9367 8934 Finished Length Front Floor Ramp (QTY: 8) Frame Overlap Length 7 3/8” 18,7 cm 9367 Overlap the Ramp and two (2) Front Floor 8934 Frames so that four (4) holes align at each end as shown.
  • Page 16 Step 2: Wall Frames 16AW You will need for this page: 5986 10389 Rear Channel Rear Angle (QTY: 9) 5986 5986 10389 Overlap two (2) Rear Wall Channels so that eight (8) holes align as shown. Insert a bolt and nut through each hole.
  • Page 17 Step 2: Continued 17BF You will need for this page: 10388 10391 157 3/8” 399,7 cm Finished Length Side Channel Side Angle (QTY: 18) Overlap two (2) Side Wall Channels so that eight (8) holes align as shown. Insert a bolt and nut through each hole.
  • Page 18 Step 3: Roof Beams 18BF You will need for this page: 10386 10386 BUILD TWO (2) BEAMS Roof Beam (QTY: 16) Overlap two (2) Roof Beams so that the bottom slots align as shown. Insert six (6) bolts and nuts as shown below. Insert two (2) bolts and nuts into slots on bottom of the Beam as shown.
  • Page 19 Step 3: Continued 19BF You will need for this page: 10386 159 3/8” 404,8 cm Finished Length Roof Beam (QTY: 14) Overlap two (2) Roof Beams so that bottom slots align but DO NOT INSERT BOLTS. Next, overlap two (2) more Roof Beams to form a second Roof Beam Assembly.
  • Page 20: Step 4: Door Track

    Step 4: Door Track You will need for this page: END VIEW 6403 9366 CORRECT INCORRECT Long Leg Track Splice (QTY: 4) Door Slide Door Track on top. (Painted) Insert screws into bottom side only. The Gables will fasten to the Door Track using the holes on the top side. Door Slide Align two (2) Door Tracks with the four (4) holes in the bottom of the Door Track Splice...
  • Page 21: Step 5: Frame Assembly

    Step 5: Frame Assembly You will need for this page: Assemblies from Step 1: • Front Floor Assembly (1) • Side Floor Assembly (2) • Rear Floor Assembly (1) (QTY: 8) (QTY: 2) Do NOT fasten your Floor Frames to your Base at this time. You will anchor your building after it is erected.
  • Page 22 Step 6: Corners 22BF You will need for this page: 6627 9374 10533 (QTY: 34) (QTY: 4) Corner Panel Wall Panel Front Panel Place washers on all bolts and screws used 6627 6627 on painted parts. 10533 10533 Use one person to support the Corner while another secures the Panels.
  • Page 23 Step 7: Wall Framing 23BF You will need for this page: Assemblies from Step 2 and Step 4: • Rear Wall Angle Assembly (1) • Side Wall Angle Assemblies (2) • Door Track Assembly (1) (QTY: 26) • Install one Side Wall Angle Assembly fi rst. •...
  • Page 24 Step 8: Wall Panels 24BF FASTEN TO WALL ANGLES You will need for this page: 6627 [ NO HARDWARE NEEDED FOR THIS STEP ] Wall Panel Lay out all Panels in the positions shown below. FASTEN TO WALL CHANNELS (STEP 10) Use the diagram to the right when attaching Wall Panels.
  • Page 25 Step 8: Continued 25BF You will need for this page: (QTY: 104) (QTY: 15) Use bolts to attach Wall Panels where Rear Wall Angles overlap. Working one side at a time, lift the Panels into place and secure top and bottom of Panels with screws.
  • Page 26 Step 9: Door Jambs 26AW You will need for this page: 9370 Door Jamb (QTY: 8) (QTY: 4) Secure Door Jambs with two (2) screws in the top and bottom of each Panel as shown. Insert two (2) bolts and nuts into the back side of each Panel as shown below.
  • Page 27 Step 10: Wall Channels 27BF You will need for this page: Assemblies from Step 2: 9365 • Rear Wall Channel Assembly (1) • Side Wall Channel Assemblies (2) Front Channel (QTY: 70) (QTY: 4) Install Rear Wall Channel by placing screws through all remaining holes in Wall Panels.
  • Page 28 Step 11: Gables 28BF You will need for this page: 6109 6108 6115 6114 6085 Large Left Large Right Small Left Small Right (QTY: 8) (QTY: 16) Bracket Gable Gable Gable Gable 69835 Green Edge Trim GABLES ARE STACKED TOGETHER (Plastic Piece) DURING SHIPPING...
  • Page 29 Step 11: Continued 29BF You will need for this page: 6636 (QTY: 14) (QTY: 3) Gable Brace Working with one Gable at a time, attach the Rear Gables to the Rear Wall Angle with screws. Gable must fi t UNDER Side Wall Angle at corner. Insert two (2) bolts and nuts where Wall Angles overlap.
  • Page 30 Step 11: Continued 30BF You will need for this page: 6636 (QTY: 18) (QTY: 2) Gable Brace Track Sup. Working with one Gable at a time, attach the through Attach Brace with bolt front Gables to the Door Track with screws. second hole from bottom only Do not insert screws into the two (2) holes closest to the peak of each Gable.
  • Page 31 Step 12: Roof Framing 31BF You will need for this page: Assemblies from Step 3: • Main Roof Beam Assembly (1) • Single Roof Beam Assemblies (2) (QTY: 12) Seal the gap between the Gables using the weather stripping tape as shown.
  • Page 32 Step 12: Continued 32BF You will need for this page: 6227 Beam Brace (QTY: 4) In the front, attach the Roof Beam Brace to the Track Support with one (1) bolt and nut as shown and rotate to align with Roof Beam.
  • Page 33 Roof Install Prep Page 33BF Use the information on this page to complete steps 13 thru 14. If Roof Beam holes do not line up with Roof Panel holes, shift the building from left to right. If this does not help, your building may not be level. Shim the corners until holes line up.
  • Page 34: Step 13: Roof Assembly

    Step 13: Roof Assembly 34BF You will need for this page: 6189 6188 67545 Right Roof Weather Left Roof (QTY: 12) (QTY: 14) Stripping Panel Panel Attach Back Right Roof Panel to Top Roof Beam only using three (3) screws. Remove Edge Trim from the Left Gable under the Roof Panel.
  • Page 35 Step 13: Continued 35BF You will need for this page: 6538 6797 Roof Panel Ridge Cap (QTY: 16) (QTY: 8) Continue to apply weather stripping. FASTEN TO RIDGE CAP (NEXT TWO PAGES) Attach two (2) Roof Panels using the diagram to the right while assembling the roof.
  • Page 36 Step 13: Continued 36BF You will need for this page: 6538 6869 Roof Panel Ridge Cap (QTY: 32) (QTY: 16) FASTEN TO RIDGE CAP (NEXT TWO PAGES) Continue to apply weather stripping. Attach four (4) Roof Panels using the diagram while assembling the roof.
  • Page 37 Step 13: Continued 37BF You will need for this page: 6538 6797 6189 6188 Left Roof Right Roof (QTY: 72) (QTY: 30) Roof Panel Ridge Cap Panel Panel Continue to apply weather stripping. Attach two(2) Roof Panels, one at a time, to Roof Beams using eight (8) screws per Panel.
  • Page 38 Step 14: Roof Trim 38BF You will need for this page: 6015 6893 6892 (QTY: 4) (QTY: 10) (QTY: 12) Roof Trim Peak Cap Left Roof Trim Right Roof Trim Slide Peak Cap legs under Ridge Cap and Trim Cap (L) Trim Cap (R) secure with two (2) bolts and nuts on each end.
  • Page 39: Step 15: Door Assembly

    Step 15: Door Assembly 39BF You will need for this page: 10477 3719 6300 Door Handle Brace Vert. Brace (QTY: 3) (QTY: 2) Handle Do not fully tighten the bolts that hold on the Door Attach the Door Handle and Door Handle until the Vertical Door Brace is in place.
  • Page 40 Step 15: Continued 40AW You will need for this page: 10497 Horiz. Brace (QTY: 6) Door Guide Slide Horizontal Brace over Door edge and secure with one (1) bolt and nut in top and bottom. Secure the Door Guides and Lower Horizontal Door Brace as shown below.
  • Page 41: Door Adjustment

    Step 17: Door Install You will need for this page: Assemblies from Step 16: • Right Door Assembly (1) • Left Door Assembly (1) (QTY: 8) Gable Door Slide From inside the building, place the bottom of the Door into the Front Floor Frame track at about the half- Door Track open position.
  • Page 42 ANCHORING OPTIONS... IMPORTANT: • If you have swing doors, they must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • If you have purchased a Floor Frame Kit, you should install it at this time. •...
  • Page 43 CARE & MAINTENANCE... Exterior Care: For a long lasting fi nish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region.
  • Page 44: How To Order

    ARROW ACCESSORIES... ROOF STRENGTHENING FLOOR FRAME KITS (heavy snow load) KITS Extra roof beams and gable braces MODELS FB47410, FB5465, designed for added protection against FB106-A, FB109-A and FB1014-A heavy snow accumulation. Increases the strength of your roof. A simple fl oor frame system made of heavy-duty, hot-dipped BEFORE AFTER galvanized steel.

Table of Contents