Mains Power Supply In Conjunction With On-Site Power Consumption; Smart Grid - Viessmann Vitocal 200-S Installation And Service Instructions Manual

Air source heat pump, split version for heating and cooling operation
Table of Contents

Advertisement

Installation sequence
Power supply
(cont.)

Mains power supply in conjunction with on-site power consumption

Without power-OFF
A
F
G
kWh
L
M
N
Fig. 41
Heat pump
A
Additional consumers (of power generated on site)
B
in the household
Electricity meter
C
Inverter
D
Isolator for the PV system
E
F
Terminal
Double-tariff meter (for special tariff for heat pump)
G
Not permissible in conjunction with PV systems for
on-site power consumption

Smart Grid

The Smart Grid functions are switched via both PSU
floating contacts.
Both floating contacts are connected to the
EA1 extension in accordance with Fig. 42.
40
B
A
C
F
N
E1E2
D /D
F
L1 L1 L2 L2 L3 L3
H
kWh
L
N
~ ~
=
D
E
F
K
kWh
M
Bi-directional meter (for PV systems to consume
H
power on site):
Energy taken from power supply utility and energy
fed into power supply utility
Meter with reverse block:
K
For energy generated by PV system
Isolator for the domestic power supply connection
L
(distribution panel)
Distribution panel
M
Domestic distribution box
N