Checking Status Leds To Verify Switch Installation - Avaya 5900 Series Installing Manual

Ethernet routing switch
Hide thumbs Also See for 5900 Series:
Table of Contents

Advertisement

Switch installation
Optical power considerations
When you connect the device to collocated equipment, ensure that enough optical attenuation exists
to avoid overloading the receivers of each device. You must consider the minimum attenuation
requirement based on the specifications of third-party equipment. For more information about
minimum insertion losses for Avaya optical products, see Installing Transceivers and Optical
Components on Avaya Ethernet Routing Switch 4900 and 5900 Series, NN47211-302.
Locating end of sale notices
Use the following procedure to locate the most up-to-date information on end of sale notices and
replacement recommendations for transceivers and optical components.
Procedure
1. Go to the Avaya Support website at http://support.avaya.com/.
2. Select Support by Product > Documents.
3. Enter the product name, and a release.
4. Select Product Lifecycle Notices.
5. Click Enter.
6. Select the End of Sale notice to view the information.

Checking status LEDs to verify switch installation

Perform this procedure to verify the hardware installation and operation of the unit.
The eight status LEDs on the front of the unit indicate the installation and operational status of the
hardware.
Before you begin
Perform the following tasks before checking the status LEDs.
• Install the fan trays and power supplies.
• Install the switch in an equipment rack or on a shelf.
• Connect power to the switch.
Procedure
1. Locate the status LEDs on the front of the unit; see the following figure.
September 2017
Installing Avaya ERS 5900 Series
Comments on this document? infodev@avaya.com
58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents