Chapter 5: Ethernet Routing Switch 8310 And 8306 Chassis Installation; Prerequisites; Chassis Installation Procedures - Avaya Ethernet Routing Switch 8300 Series Installation Manual

Chassis
Hide thumbs Also See for Ethernet Routing Switch 8300 Series:
Table of Contents

Advertisement

Chapter 5: Ethernet Routing Switch 8310
This section describes how to install the Ethernet Routing Switch 8310 and 8306 chassis.
Electrostatic alert:
ESD
To prevent damage from electrostatic discharge, always wear an antistatic wrist strap connected to an
electrostatic discharge (ESD) jack when performing maintenance on this product. Ensure that the wrist
strap makes contact with your skin.

Prerequisites

• Inspect all items for shipping damage. If you detect damage, do not install the chassis.
Call the Avaya Technical Solutions Center in your area.
• Verify that the items in the shipping container match those on the shipment packing list.
Use
Table 3: Chassis shipping accessories: Ethernet Routing Switch 8310 and 8306
chassis
• Verify that you have supplied all the other required hardware.
• Ensure that your installation site meets the physical, electrical, and environmental
requirements described in

Chassis installation procedures

This task flow shows you the sequence of procedures you perform to install the chassis. To
link to a procedure, click the procedure title in
Installation — Chassis
and 8306 chassis installation
on page 27 as achecklist when verifying the contents of the shipping container.
Site requirements
on page 25.
Navigation
on page 32.
May 2011
31

Advertisement

Table of Contents
loading

Table of Contents