Chapter 6: Procedures For Installation Of The Switch; Installation Preparation - Avaya 5000 Series Installation Manual

Ethernet routing switch
Hide thumbs Also See for 5000 Series:
Table of Contents

Advertisement

Chapter 6: Procedures for installation of the

Installation preparation

This procedure describes how to prepare to install a switch.
Warning:
To avoid bodily injury from hazardous electrical shock and current, never remove the top of
the device. There are no user-serviceable components inside.
1. Determine the type of installation
2. Prepare the site.
3. Collect the tools required to install a switch.
Verifying environment suitability
This procedure describes how to verify environment suitability.
1. To verify environmental suitability for installation of the ERS 5500 Series switch,
2. To verify environmental suitability for installation of the ERS 5600 Series switch,
Avaya Ethernet Routing Switch 5000 Series Installation
switch
ensure that the area where you want to install and operate the switch meets the
requirements listed in
environmental requirements
ensure that the area where you want to install and operate the switch meets the
requirements listed in
environmental requirements
Table 8: Job aid: Ethernet Routing Switch 5500 Series
on page 58.
Table 9: Job aid: Ethernet Routing Switch 5600 Series
on page 59
December 2010
57

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents