Chapter 3: Preinstallation checklist

Before you install the Avaya Ethernet Routing Switch 5900 Series, make sure that you complete the
tasks in the preinstallation checklist.
No.
Task
1.
Review the technical specification for
the switch. Make sure that the area
where you install the switch and
where it will operate meet the
requirements.
2.
Verify the power supply unit (PSU)
specifications. Optionally order a
redundant PSU to provide
redundancy and load sharing.
3.
Make sure that you have the
following tools and cables:
• Phillips #2 screwdriver RJ-45
console port cable
• ESD cable
4.
Unpack the equipment.
5.
Verify the contents of the shipped
package.
6.
Make sure that the power cord has
the correct country-specific
termination.
7
Prepare the rack.
September 2017
Description
For the physical, electrical, and
environmental specifications, see
Technical specifications
See
AC power specifications
page 18.
See
Identifying cables to use with the
Ethernet Routing Switch
Observe ESD precautions when you
unpack the equipment. See
discharge prevention
See
Verifying the package contents
page 26 for a description of the
components that are provided with the
switch. If any components are missing,
contact Avaya support at
support.avaya.com/.
See
Power Supply Cords
Ensure that there is enough rack space
of 1.75 inches (4.45 centimeters).
Ensure that the rack is bolted to the floor
and braced if necessary.
Installing Avaya ERS 5900 Series
Comments on this document? infodev@avaya.com
on page 16. .
on
on page 54.
Electrostatic
on page 15.
on
https://
on page 22.
Table continues...
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents