Preparing for installation
!
Please note
The boiler can be damaged during transport with
a sack truck.
Only slide the sack truck under the boiler from
the right-hand side.
Secure the boiler to the sack truck with ties.
Pass ties underneath the vertical hanging
rails.
Transporting the boiler
Transport the boiler to the installation location in an
upright position and, if possible, on the pallet.
The boiler may also be transported using a sack
truck.
Siting
1. Release the ties and remove the wooden crate.
For this, undo the bottom 4 wood screws. Lift the
wooden crate from the boiler. If there is not enough
space, dismantle the wooden crate.
2. Undo 4 hexagon wood screws, lift the boiler from
the pallet and set it in place.
3. Level the boiler using the 6 adjustable feet.
First adjust the rear right adjustable foot to
approx. medium height. This foot will not be
accessible later on.
To adjust the rear middle foot, remove the ash
box (see page 39).
(cont.)
4. Check all hanging rails and cross beams with a spi-
5. Remove the bag containing the boiler type plate
6. Remove the cleaning brush and handle from the
Preparing for installation
When using transport aids
ple can carry the boiler. 4 pipes for screwing into the
boiler, see page 10.
The entire boiler can be lifted by lifting eye
page 10).
If doing so, first undo the cable duct and push it to
one side.
For handling in tight spaces, individual components
at the front and the left-hand side of the boiler can be
removed.
rit level.
If necessary, realign the components vertically and
horizontally. Undo the fixing screws.
from the left-hand cross beam and retain. The type
plate is later affixed to the left-hand casing panel.
boiler and retain.
B
(accessories), 4 peo-
(see
A