Download Print this page

HP ProOne 480 G3 Disassembly Instructions Manual page 34

Non-touch all-in-one business pc

Advertisement

: Pyxis400 DISASS'Y SOP
Document No.
Inspect BASE PAN
Operation Name :
Glove Requirements: Half-finger gloves
No leak
No
leak
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Tabulator:
Xin-Xin Chen
Standard Operation Procedure
Qty.
Auditor : Ethan Lai
Ver. :
Steps:
1. Confirm there is no RF material shortage for
BASE PAN, then put it into the material box.
No leak
Fixture list (Specification)
Issue Department:
Station :
1.00
2017/5/23
Date
:
No leak
NPSU-PPE
28(1/1)
Qty.

Advertisement

loading