: Pyxis400 DISASS'Y SOP
Document No.
Take out DC-IN cable & BOTTOM BAND
Operation Name :
Glove Requirements: Half-finger gloves
Note: If finding anything uncommon, notice foreman or assistant at once.
Fixture list (Specification)
Electric Screwdriver (S-4000MS)
Bits Type: T15,φ=5mm,L=60mm
Tabulator:
Xin-Xin Chen
Standard Operation Procedure
Screw
Fig. 1
DC-IN cable
Fig. 2
Qty.
1
1
Auditor : Ethan Lai
Ver. :
Steps:
1. Unscrew (Torx Pin-Head × 2) all joints of DC-
IN cable (Fig. 1).
Torsion: 4.0 ± 1.0 kgf.cm
Take the screwdriver vertically to the screw
holes.
2. Pull out DC-IN cable vertically from M/B side
(Fig. 2).
Don't pull out the cable in the oblique
direction.
3. Take out BOTTOM BAND (Fig. 3).
Put BOTTOM BAND into the material box.
Fixture list (Specification)
Issue Department:
Station :
1.00
2017/5/23
Date
:
Fig. 3
NPSU-PPE
20(1/1)
Qty.