HP ProLiant DL145 Maintenance And Service Manual page 31

Hide thumbs Also See for ProLiant DL145:
Table of Contents

Advertisement

f. Fold the terminated end of the SCSI cable in the manner illustrated in the following
g. Reattach the mylar sheet over the cable back to the air duct surface.
h. Route the SCSI cable through the cable management opening of the chassis' partition
Figure 2-24: SCSI cable routing for low-profile controller boards phase 3
i.
j.
k. Check that all cables are clear of the hard drive carrier and are properly routed to
HP ProLiant DL145 Generation 2 Server Maintenance and Service Guide
All manuals and user guides at all-guides.com
figure.
wall.
Route the power cable through the cable management opening of the chassis'
partition wall.
Connect the SCSI and power cables to their corresponding connectors on the rear of
the new drive.
Make sure the terminated end of the SCSI cable is positioned in the manner
illustrated in Figure 2-25.
their corresponding connectors, then tighten the screw that secures the hard drive
assembly to the chassis.
Removal and Replacement Procedures
2-21

Advertisement

Table of Contents
loading

Table of Contents